SECTORS OF ACTIVITY

01 /

Gas Transportation and Distribution Companies

SON REUS – INCA – ALCUDIA PIPELINE (SONALCU)

Customer: FERROVIAL AGROMAN

Final customer: (REDEXIS GAS)

Location: Palma de Mallorca

Date: February 2015

Duration: 6 months

Short description: Supply and installation of valve sets, RMS, and electrical installations for each of the 5 different junctions of the Sonalcu Gas Pipeline.

– 5 RMS with MOP80/MOP16

– 1 metering station with MOP80/MOP16

HUERCAL-OVERA-BAZA-GUADIX GAS PIPELINE (HUERGUA)

Customer: ACCIONA Infraestructuras

Final customer: (REDEXIS GAS)

Location: Almería, Granada

Date: July 2014

Duration: 5 months

Short description: Manufacture, supply, and installation of RMS for each of the 7 junctions of the Huerga Gas Pipeline.

– 7 RMS with MOP80/MOP16

– 2 RMS with MOP80/MOP49.5

02 /

Combined Cycles
and Co-generation

AS PONTES COMBINED CYCLE THERMAL POWER PLANT

Customer: GR4 CYMSA

Final customer: ENDESA GENERACIÓN

Location: As Pontes, A Coruña

Date: February 2006

Duration: 13 months

Short description: Supply, installation, and operation launch for the As Pontes 800 MW Combined Cycle Thermal Power Plant of one RMS for co-generation turbines, and one RMS for the hot water boiler circuit.

ENCE POWER PLANT

Customer: OHL INDUSTRIAL

Final customer: ENCE

Location: Huelva

Date: August 2011

Duration: 11 months

Short description: Manufacture, supply, and installation of RMS with an alternative heating system (steam/water) and automatic and manual control, for a power plant with a biomass of 50 MW.

03 /

Industries that use gas as a fuel in their production processes

RECEIVING FACILITY FOR HEINZ MANUFACTURING

Customer: COFELY

Final customer: HEINZ MANUFACTURING SPAIN

Date: January 2013

Duration: 10 months

Short description: Receiving facility for natural gas to supply steam boilers, and subsequent legal certification of the facilities.

04 /

Engineering, construction, and other companies involved in transportation, distribution, or regasification projects, as well as for cryogenic plants.

RMS DISTRIBUTION FOR THE BARBONES-TENDALES GASIFICATION CONSORTIUM

Customer: MAESSA

Final customer: BARBONES-TENDALES GASIFICATION CONSORTIUM

Location: Ecuador

Date: December 2012

Duration: 7 months

Short description: Supply, shipping, and start-up of 1 RMS for transport and 11 for distribution, all of which were assembled within a metal cabinet.