SECTORS OF ACTIVITY
SECTORS OF ACTIVITY
01 /
Gas Transportation and Distribution Companies
SON REUS – INCA – ALCUDIA PIPELINE (SONALCU)
Customer: FERROVIAL AGROMAN
Final customer: (REDEXIS GAS)
Location: Palma de Mallorca
Date: February 2015
Duration: 6 months
Short description: Supply and installation of valve sets, RMS, and electrical installations for each of the 5 different junctions of the Sonalcu Gas Pipeline.
– 5 RMS with MOP80/MOP16
– 1 metering station with MOP80/MOP16
HUERCAL-OVERA-BAZA-GUADIX GAS PIPELINE (HUERGUA)
Customer: ACCIONA Infraestructuras
Final customer: (REDEXIS GAS)
Location: Almería, Granada
Date: July 2014
Duration: 5 months
Short description: Manufacture, supply, and installation of RMS for each of the 7 junctions of the Huerga Gas Pipeline.
– 7 RMS with MOP80/MOP16
– 2 RMS with MOP80/MOP49.5
02 /
Combined Cycles
and Co-generation
AS PONTES COMBINED CYCLE THERMAL POWER PLANT
Customer: GR4 CYMSA
Final customer: ENDESA GENERACIÓN
Location: As Pontes, A Coruña
Date: February 2006
Duration: 13 months
Short description: Supply, installation, and operation launch for the As Pontes 800 MW Combined Cycle Thermal Power Plant of one RMS for co-generation turbines, and one RMS for the hot water boiler circuit.
ENCE POWER PLANT
Customer: OHL INDUSTRIAL
Final customer: ENCE
Location: Huelva
Date: August 2011
Duration: 11 months
Short description: Manufacture, supply, and installation of RMS with an alternative heating system (steam/water) and automatic and manual control, for a power plant with a biomass of 50 MW.
03 /
Industries that use gas as a fuel in their production processes
RECEIVING FACILITY FOR HEINZ MANUFACTURING
Customer: COFELY
Final customer: HEINZ MANUFACTURING SPAIN
Date: January 2013
Duration: 10 months
Short description: Receiving facility for natural gas to supply steam boilers, and subsequent legal certification of the facilities.
04 /
Engineering, construction, and other companies involved in transportation, distribution, or regasification projects, as well as for cryogenic plants.
RMS DISTRIBUTION FOR THE BARBONES-TENDALES GASIFICATION CONSORTIUM
Customer: MAESSA
Final customer: BARBONES-TENDALES GASIFICATION CONSORTIUM
Location: Ecuador
Date: December 2012
Duration: 7 months
Short description: Supply, shipping, and start-up of 1 RMS for transport and 11 for distribution, all of which were assembled within a metal cabinet.